Engineering License from Georgia to Indiana: Does It Transfer? (2026)
Last verified: 2026-07-21 · source: Indiana State Board of Registration for Professional Engineers (Indiana Professional Licensing Agency, PLA) ↗
A PE license transfers from Georgia to Indiana by endorsement — there is no automatic reciprocity, but you do not start over. Apply to the Indiana State Board of Registration for Professional Engineers (Indiana Professional Licensing Agency, PLA), verify your Georgia license, and meet Indiana's endorsement requirements. FE (Part I) and PE (Part II, the NCEES PE exam) results transfer via your NCEES Record and are not retaken (the FE is waived if already passed elsewhere); HOWEVER Indiana requires every comity applicant to complete Part III of the Indiana PE examination — a take-home (open-book) exam on professional conduct and Indiana registration law, submitted with the application.
Verify this exact pair in the checker
Same data, interactive — with share link and board links.
Verdict
Licensure by endorsement
Indiana grants PE licensure by comity, so a Professional Engineer licensed in Georgia does not start over — but does file a full Indiana application. Your Georgia license, ABET degree, qualifying experience, and FE and PE results reach the Indiana State Board of Registration for Professional Engineers (Indiana Professional Licensing Agency, PLA) through your NCEES Record; the board's task is to confirm they meet Indiana's practice act, not to re-test you. FE (Part I) and PE (Part II, the NCEES PE exam) results transfer via your NCEES Record and are not retaken (the FE is waived if already passed elsewhere); HOWEVER Indiana requires every comity applicant to complete Part III of the Indiana PE examination — a take-home (open-book) exam on professional conduct and Indiana registration law, submitted with the application. Two things govern your timeline: keeping your Georgia license active and unencumbered while the Indiana application is pending, and clearing any Indiana-specific exam or statutes review before the license issues.
What changes, Georgia → Indiana
| Georgia (current) | Indiana (destination) | |
|---|---|---|
| Application fee | $100 ($100 Professional or Structural Engineer Application by Comity fee (non-refundable) per the board's official fee schedule, plus a $5 processing fee for each online submission; transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES) | $300 ($300 comity/reciprocity registration fee (864 IAC 1.1-12-1, non-refundable and non-transferable). A separate original certificate (issuance) fee applies: $50 if the registration is issued in an odd-numbered year or $100 if issued in an even-numbered year. NCEES Record transmittal is $175 first board / $100 each additional, paid to NCEES) |
| Processing time | ~4 weeks (The Georgia SOS How-To Guide states comity applications are generally processed within about 20 business days (~4 weeks) of a complete application, evaluated in order received; a deficiency notice restarts the 20-day count) | The board does not publish a comity turnaround; comity applications are reviewed by the board for substantial equivalence to Indiana's requirements, including Part III and the reference reports |
| Licensing authority | Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board) | Indiana State Board of Registration for Professional Engineers (Indiana Professional Licensing Agency, PLA) |
The destination column is what you must satisfy — Indiana sets the rules for this move.
Step by step
- Confirm Indiana's current requirements on the Indiana State Board of Registration for Professional Engineers (Indiana Professional Licensing Agency, PLA) website (linked below) — rules change.
- Submit the endorsement application to the Indiana State Board of Registration for Professional Engineers (Indiana Professional Licensing Agency, PLA) (application linked below).
- Arrange license verification from your current state via the verification system.
- Hold a PE registration in another U.S. state/territory issued under requirements that do not conflict with Indiana's (education, experience, and the FE + PE exams).
- Complete Part III of the Indiana PE examination (take-home, open-book exam on professional conduct and Indiana registration law).
- Provide reference reports on the applicant's competence — at least three from registered professional engineers (Indiana's application requests five references, three of them from PEs).
- Have the NCEES Record made available to Indiana, or submit certification of FE/PE passage plus official college transcripts.
- Pay the fees ($300 ($300 comity/reciprocity registration fee (864 IAC 1.1-12-1, non-refundable and non-transferable). A separate original certificate (issuance) fee applies: $50 if the registration is issued in an odd-numbered year or $100 if issued in an even-numbered year. NCEES Record transmittal is $175 first board / $100 each additional, paid to NCEES)) and allow The board does not publish a comity turnaround; comity applications are reviewed by the board for substantial equivalence to Indiana's requirements, including Part III and the reference reports.
Official links
Related guides
Frequently asked questions
Does Indiana accept a Georgia PE license?
A PE license transfers from Georgia to Indiana by endorsement — there is no automatic reciprocity, but you do not start over. Apply to the Indiana State Board of Registration for Professional Engineers (Indiana Professional Licensing Agency, PLA), verify your Georgia license, and meet Indiana's endorsement requirements. FE (Part I) and PE (Part II, the NCEES PE exam) results transfer via your NCEES Record and are not retaken (the FE is waived if already passed elsewhere); HOWEVER Indiana requires every comity applicant to complete Part III of the Indiana PE examination — a take-home (open-book) exam on professional conduct and Indiana registration law, submitted with the application.
Do I retake the FE or PE exam moving from Georgia to Indiana?
FE (Part I) and PE (Part II, the NCEES PE exam) results transfer via your NCEES Record and are not retaken (the FE is waived if already passed elsewhere); HOWEVER Indiana requires every comity applicant to complete Part III of the Indiana PE examination — a take-home (open-book) exam on professional conduct and Indiana registration law, submitted with the application.
What does the Georgia-to-Indiana comity application cost?
$300 ($300 comity/reciprocity registration fee (864 IAC 1.1-12-1, non-refundable and non-transferable). A separate original certificate (issuance) fee applies: $50 if the registration is issued in an odd-numbered year or $100 if issued in an even-numbered year. NCEES Record transmittal is $175 first board / $100 each additional, paid to NCEES).
Can I keep my Georgia PE license after I'm licensed in Indiana?
Yes — PE licenses stack. Keep the Georgia license active (its renewal and continuing-education/PDH clock run separately) and you hold both. Engineers working near state lines or nationally routinely carry several PE licenses at once, all sourced from a single NCEES Record.
Sources
Primary sources only — official boards and compact commissions. Data last verified 2026-07-21.
- Indiana Code 25-31-1-21 — License by reciprocity (IGA official, Title 25 Art. 31 Ch. 1) ↗ (accessed 2026-07-21)
- 864 IAC 1.1-12-1 — Fees charged by board (comity registration $300; original certificate $50/$100) ↗ (accessed 2026-07-21)
- Indiana PLA — Engineering Licensing Information (comity: Part III exam, PE references, NCEES file) ↗ (accessed 2026-07-21)
- NCEES — Records Program (comity licensure) ↗ (accessed 2026-07-21)
- Georgia PELS Board — Fee Schedule (Rev. 3-4-2024): PE/SE Application by Comity $100 + $5 online processing ↗ (accessed 2026-07-21)
- Georgia SOS — How-To Guide: Professional Engineer Licensure ($100 comity fee; ~20 business days) ↗ (accessed 2026-07-21)
- NCEES — Georgia now requires NCEES Record for comity licensure ↗ (accessed 2026-07-21)
Reviewed by Billy Reiner, Editor · verified against primary sources 2026-07-21
How we verify · All sources · spot an error? [email protected]