Skip to content
LicenseReciprocity

Engineering License from North Carolina to Arizona: Does It Transfer? (2026)

Last verified: 2026-07-21 · source: Arizona State Board of Technical Registration (AZBTR) ↗

A PE license transfers from North Carolina to Arizona by endorsement — there is no automatic reciprocity, but you do not start over. Apply to the Arizona State Board of Technical Registration (AZBTR), verify your North Carolina license, and meet Arizona's endorsement requirements. FE and PE exam results transfer through your NCEES Record and are not retaken; Arizona has no state-specific engineering exam and no jurisprudence exam.

Verify this exact pair in the checker

Same data, interactive — with share link and board links.

Run the Reciprocity Checker →

Verdict

Licensure by endorsement

Arizona grants PE licensure by comity, so a Professional Engineer licensed in North Carolina does not start over — but does file a full Arizona application. Your North Carolina license, ABET degree, qualifying experience, and FE and PE results reach the Arizona State Board of Technical Registration (AZBTR) through your NCEES Record; the board's task is to confirm they meet Arizona's practice act, not to re-test you. FE and PE exam results transfer through your NCEES Record and are not retaken; Arizona has no state-specific engineering exam and no jurisprudence exam. Two things govern your timeline: keeping your North Carolina license active and unencumbered while the Arizona application is pending, and clearing any Arizona-specific exam or statutes review before the license issues.

What changes, North Carolina → Arizona

Side-by-side: North Carolina vs Arizona (Engineering (PE)), verified 2026-07-21
North Carolina (current)Arizona (destination)
Application fee$100 (NC comity application fee (non-refundable); transmitting an NCEES Record to the board costs $175 for the first board and $100 for each additional board, paid separately to NCEES)$325 ($325 combined application and initial registration fee ($100 application + $225 registration, the same structure AZBTR uses for other individual registrations), payable by check/money order/credit card to AZBTR; the same amount applies to the Reciprocity/Endorsement, Universal Licensure, and Traditional pathways. Transmitting an NCEES Record costs $175 first board / $100 each additional, paid separately to NCEES. See verification note re: a $445 figure recorded in a prior draft)
Processing timeNCBELS publishes no comity turnaround; comity applications are administratively approved by the Executive Director once the NCEES Record and references are received (NCEES Record completion itself averages 2-3 weeks)No published turnaround; board staff (and/or volunteer registrant reviewers) verify the application and forward it to the full Board only in rare instances. An application is not reviewed until administratively complete (all verifications received)
Licensing authorityNorth Carolina Board of Examiners for Engineers and Surveyors (NCBELS)Arizona State Board of Technical Registration (AZBTR)

The destination column is what you must satisfy — Arizona sets the rules for this move.

Step by step

  1. Confirm Arizona's current requirements on the Arizona State Board of Technical Registration (AZBTR) website (linked below) — rules change.
  2. Submit the endorsement application to the Arizona State Board of Technical Registration (AZBTR) (application linked below).
  3. Arrange license verification from your current state via the verification system.
  4. Reciprocity/Endorsement pathway: hold an NCEES Model Law Engineer (MLE) designation and an active license in another jurisdiction, plus four years of experience after that licensure.
  5. Applicants without an MLE can still qualify through the Traditional pathway (eight years of combined engineering education/experience with the FE and PE passed).
  6. Arizona residents licensed elsewhere may use an expedited Universal Licensure pathway.
  7. Demonstrate competency in the branch of engineering sought through education, examination, or experience.
  8. Pay the fees ($325 ($325 combined application and initial registration fee ($100 application + $225 registration, the same structure AZBTR uses for other individual registrations), payable by check/money order/credit card to AZBTR; the same amount applies to the Reciprocity/Endorsement, Universal Licensure, and Traditional pathways. Transmitting an NCEES Record costs $175 first board / $100 each additional, paid separately to NCEES. See verification note re: a $445 figure recorded in a prior draft)) and allow No published turnaround; board staff (and/or volunteer registrant reviewers) verify the application and forward it to the full Board only in rare instances. An application is not reviewed until administratively complete (all verifications received).

Official links

Related guides

Frequently asked questions

Does Arizona accept a North Carolina PE license?

A PE license transfers from North Carolina to Arizona by endorsement — there is no automatic reciprocity, but you do not start over. Apply to the Arizona State Board of Technical Registration (AZBTR), verify your North Carolina license, and meet Arizona's endorsement requirements. FE and PE exam results transfer through your NCEES Record and are not retaken; Arizona has no state-specific engineering exam and no jurisprudence exam.

Do I retake the FE or PE exam moving from North Carolina to Arizona?

FE and PE exam results transfer through your NCEES Record and are not retaken; Arizona has no state-specific engineering exam and no jurisprudence exam.

What does the North Carolina-to-Arizona comity application cost?

$325 ($325 combined application and initial registration fee ($100 application + $225 registration, the same structure AZBTR uses for other individual registrations), payable by check/money order/credit card to AZBTR; the same amount applies to the Reciprocity/Endorsement, Universal Licensure, and Traditional pathways. Transmitting an NCEES Record costs $175 first board / $100 each additional, paid separately to NCEES. See verification note re: a $445 figure recorded in a prior draft).

Can I keep my North Carolina PE license after I'm licensed in Arizona?

Yes — PE licenses stack. Keep the North Carolina license active (its renewal and continuing-education/PDH clock run separately) and you hold both. Engineers working near state lines or nationally routinely carry several PE licenses at once, all sourced from a single NCEES Record.

Sources

Primary sources only — official boards and compact commissions. Data last verified 2026-07-21.

Reviewed by Billy Reiner, Editor · verified against primary sources 2026-07-21

How we verify · All sources · spot an error? [email protected]