Skip to content
LicenseReciprocity

Engineering License from South Dakota to Georgia: Does It Transfer? (2026)

Last verified: 2026-07-21 · source: Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board) ↗

A PE license transfers from South Dakota to Georgia by endorsement — there is no automatic reciprocity, but you do not start over. Apply to the Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board), verify your South Dakota license, and meet Georgia's endorsement requirements. FE and PE exam results transfer through your NCEES Record and are not retaken; Georgia has no separate state jurisprudence or law exam for comity.

Verify this exact pair in the checker

Same data, interactive — with share link and board links.

Run the Reciprocity Checker →

Verdict

Licensure by endorsement

Georgia grants PE licensure by comity, so a Professional Engineer licensed in South Dakota does not start over — but does file a full Georgia application. Your South Dakota license, ABET degree, qualifying experience, and FE and PE results reach the Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board) through your NCEES Record; the board's task is to confirm they meet Georgia's practice act, not to re-test you. FE and PE exam results transfer through your NCEES Record and are not retaken; Georgia has no separate state jurisprudence or law exam for comity. Two things govern your timeline: keeping your South Dakota license active and unencumbered while the Georgia application is pending, and clearing any Georgia-specific exam or statutes review before the license issues.

What changes, South Dakota → Georgia

Side-by-side: South Dakota vs Georgia (Engineering (PE)), verified 2026-07-21
South Dakota (current)Georgia (destination)
Application fee$100 (SD Board of Technical Professions comity/reciprocity individual application fee; transmitting an NCEES Record costs $175 first board / $100 each additional, paid separately to NCEES. Individual biennial renewal is $80.)$100 ($100 Professional or Structural Engineer Application by Comity fee (non-refundable) per the board's official fee schedule, plus a $5 processing fee for each online submission; transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES)
Processing timeThe Board of Technical Professions publishes no comity turnaround; comity applications are processed once license verification (or the NCEES record) is received.~4 weeks (The Georgia SOS How-To Guide states comity applications are generally processed within about 20 business days (~4 weeks) of a complete application, evaluated in order received; a deficiency notice restarts the 20-day count)
Licensing authoritySouth Dakota Board of Technical ProfessionsGeorgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board)

The destination column is what you must satisfy — Georgia sets the rules for this move.

Step by step

  1. Confirm Georgia's current requirements on the Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board) website (linked below) — rules change.
  2. Submit the endorsement application to the Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board) (application linked below).
  3. Arrange license verification from your current state via the verification system.
  4. Hold an active PE license in good standing in another U.S. jurisdiction based on comparable qualifications (NCEES Model Law Engineer status expedites review).
  5. Have NCEES transmit a completed NCEES Record to the Georgia PELS Board (Georgia requires the NCEES Record for comity licensure).
  6. Provide a secure and verifiable document establishing lawful presence (Georgia SAVE requirement).
  7. Show no record of disciplinary action against any license held.
  8. Pay the fees ($100 ($100 Professional or Structural Engineer Application by Comity fee (non-refundable) per the board's official fee schedule, plus a $5 processing fee for each online submission; transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES)) and allow ~4 weeks (The Georgia SOS How-To Guide states comity applications are generally processed within about 20 business days (~4 weeks) of a complete application, evaluated in order received; a deficiency notice restarts the 20-day count).

Official links

Related guides

Frequently asked questions

Does Georgia accept a South Dakota PE license?

A PE license transfers from South Dakota to Georgia by endorsement — there is no automatic reciprocity, but you do not start over. Apply to the Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board), verify your South Dakota license, and meet Georgia's endorsement requirements. FE and PE exam results transfer through your NCEES Record and are not retaken; Georgia has no separate state jurisprudence or law exam for comity.

Do I retake the FE or PE exam moving from South Dakota to Georgia?

FE and PE exam results transfer through your NCEES Record and are not retaken; Georgia has no separate state jurisprudence or law exam for comity.

What does the South Dakota-to-Georgia comity application cost?

$100 ($100 Professional or Structural Engineer Application by Comity fee (non-refundable) per the board's official fee schedule, plus a $5 processing fee for each online submission; transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES).

Can I keep my South Dakota PE license after I'm licensed in Georgia?

Yes — PE licenses stack. Keep the South Dakota license active (its renewal and continuing-education/PDH clock run separately) and you hold both. Engineers working near state lines or nationally routinely carry several PE licenses at once, all sourced from a single NCEES Record.

Sources

Primary sources only — official boards and compact commissions. Data last verified 2026-07-21.

Reviewed by Billy Reiner, Editor · verified against primary sources 2026-07-21

How we verify · All sources · spot an error? [email protected]