Engineering License from Washington to Georgia: Does It Transfer? (2026)
Last verified: 2026-07-21 · source: Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board) ↗
A PE license transfers from Washington to Georgia by endorsement — there is no automatic reciprocity, but you do not start over. Apply to the Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board), verify your Washington license, and meet Georgia's endorsement requirements. FE and PE exam results transfer through your NCEES Record and are not retaken; Georgia has no separate state jurisprudence or law exam for comity.
Verify this exact pair in the checker
Same data, interactive — with share link and board links.
Verdict
Licensure by endorsement
Georgia grants PE licensure by comity, so a Professional Engineer licensed in Washington does not start over — but does file a full Georgia application. Your Washington license, ABET degree, qualifying experience, and FE and PE results reach the Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board) through your NCEES Record; the board's task is to confirm they meet Georgia's practice act, not to re-test you. FE and PE exam results transfer through your NCEES Record and are not retaken; Georgia has no separate state jurisprudence or law exam for comity. Two things govern your timeline: keeping your Washington license active and unencumbered while the Georgia application is pending, and clearing any Georgia-specific exam or statutes review before the license issues.
What changes, Washington → Georgia
| Washington (current) | Georgia (destination) | |
|---|---|---|
| Application fee | $110 (Washington PE comity registration application fee is $110 (payable to the Department of Licensing; includes license and wall certificate). Biennial renewal is $128. Transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid to NCEES.) | $100 ($100 Professional or Structural Engineer Application by Comity fee (non-refundable) per the board's official fee schedule, plus a $5 processing fee for each online submission; transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES) |
| Processing time | ~4 weeks (BRPELS issues new licenses the first week of each month and asks applicants to contact the office only if more than 4 weeks have passed; transmitting an NCEES Record is the preferred, faster path but does not generate automatic approval.) | ~4 weeks (The Georgia SOS How-To Guide states comity applications are generally processed within about 20 business days (~4 weeks) of a complete application, evaluated in order received; a deficiency notice restarts the 20-day count) |
| Licensing authority | Washington State Board of Registration for Professional Engineers and Land Surveyors (BRPELS), Washington State Department of Licensing | Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board) |
The destination column is what you must satisfy — Georgia sets the rules for this move.
Step by step
- Confirm Georgia's current requirements on the Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board) website (linked below) — rules change.
- Submit the endorsement application to the Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board) (application linked below).
- Arrange license verification from your current state via the verification system.
- Hold an active PE license in good standing in another U.S. jurisdiction based on comparable qualifications (NCEES Model Law Engineer status expedites review).
- Have NCEES transmit a completed NCEES Record to the Georgia PELS Board (Georgia requires the NCEES Record for comity licensure).
- Provide a secure and verifiable document establishing lawful presence (Georgia SAVE requirement).
- Show no record of disciplinary action against any license held.
- Pay the fees ($100 ($100 Professional or Structural Engineer Application by Comity fee (non-refundable) per the board's official fee schedule, plus a $5 processing fee for each online submission; transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES)) and allow ~4 weeks (The Georgia SOS How-To Guide states comity applications are generally processed within about 20 business days (~4 weeks) of a complete application, evaluated in order received; a deficiency notice restarts the 20-day count).
Official links
Related guides
Frequently asked questions
Does Georgia accept a Washington PE license?
A PE license transfers from Washington to Georgia by endorsement — there is no automatic reciprocity, but you do not start over. Apply to the Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board), verify your Washington license, and meet Georgia's endorsement requirements. FE and PE exam results transfer through your NCEES Record and are not retaken; Georgia has no separate state jurisprudence or law exam for comity.
Do I retake the FE or PE exam moving from Washington to Georgia?
FE and PE exam results transfer through your NCEES Record and are not retaken; Georgia has no separate state jurisprudence or law exam for comity.
What does the Washington-to-Georgia comity application cost?
$100 ($100 Professional or Structural Engineer Application by Comity fee (non-refundable) per the board's official fee schedule, plus a $5 processing fee for each online submission; transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES).
Can I keep my Washington PE license after I'm licensed in Georgia?
Yes — PE licenses stack. Keep the Washington license active (its renewal and continuing-education/PDH clock run separately) and you hold both. Engineers working near state lines or nationally routinely carry several PE licenses at once, all sourced from a single NCEES Record.
Sources
Primary sources only — official boards and compact commissions. Data last verified 2026-07-21.
- Georgia PELS Board — Fee Schedule (Rev. 3-4-2024): PE/SE Application by Comity $100 + $5 online processing ↗ (accessed 2026-07-21)
- Georgia SOS — How-To Guide: Professional Engineer Licensure ($100 comity fee; ~20 business days) ↗ (accessed 2026-07-21)
- NCEES — Georgia now requires NCEES Record for comity licensure ↗ (accessed 2026-07-21)
- NCEES — Records Program (comity licensure) ↗ (accessed 2026-07-21)
- BRPELS — Professional Engineer by Comity ↗ (accessed 2026-07-21)
- BRPELS — Fees (PE comity $110; PE renewal $128) ↗ (accessed 2026-07-21)
- NCEES — Records Program (comity licensure; $175 first board / $100 each additional) ↗ (accessed 2026-07-21)
Reviewed by Billy Reiner, Editor · verified against primary sources 2026-07-21
How we verify · All sources · spot an error? [email protected]