Skip to content
LicenseReciprocity

How PE License Transfer Works: Comity, the NCEES Record, and State-Specific Exams

Last verified: 2026-10-29
Researched with AI assistance from official board, compact and national-body sources; every section cites them · How these pages are made

A Professional Engineer license transfers between states through licensure by comity: you apply to the destination board, which reviews your ABET-accredited degree, qualifying experience, and national FE and PE exam results — delivered in an NCEES Record — against its own practice act, then issues you a new PE license. There is no interstate compact and no automatic reciprocity; comity is the near-universal route, and the FE and PE are never retaken on a move.

Check your exact transfer pathway

Pathway, requirements, fees, and board links for your specific state pair.

Run the Reciprocity Checker →

Why engineering has no compact

Nursing built one interstate compact and a shared multistate license; engineering deliberately did not. Every state's practice act ties the authority to seal engineering work to a license that state issued, and the PE seal is a legal instrument of that state, so no board cedes it to a common license. What the profession centralized instead is the examinations and the paperwork: NCEES writes and scores the FE and PE for every state and runs the Record program that moves your file between boards. The result is one national standard for competence and fifty-one separate licenses, with comity as the bridge between them.

What an NCEES Record does

An NCEES Record is a verified, reusable file that NCEES builds once from your transcripts, employment history, professional references, and FE/PE exam results, then transmits directly to any board you designate. It exists because comity applications ask every board for the same evidence — so rather than re-gathering transcripts and references for each state, you maintain one Record and dispatch it. Engineers whose education, exams, and experience meet the national Model Law can also carry the Model Law Engineer (MLE) designation on that Record, which many boards treat as pre-cleared and process faster.

The comity application, step by step

The sequence is consistent across boards even though the fees are not. Confirm your current PE license is active and unencumbered — the good-standing verification is the one check no board waives. Build or update your NCEES Record and have NCEES transmit it to the destination board. File that board's comity or endorsement application and pay its fee, separate from the Record transmittal fee. Then clear anything the state adds beyond the FE and PE: California and Oregon require state-specific seismic and/or surveying exams, and some boards require a short statutes, rules, or ethics review. None of these replaces the FE or PE; they sit beside them.

Common pitfalls

Four mistakes cost engineers time. Assuming comity is automatic — it is a full application with board review, not a transfer of the old license. Letting the origin license lapse mid-application, which breaks the good-standing verification the destination board relies on. Overlooking a state add-on exam, most often California's seismic and surveying requirements. And trusting an aggregator's "reciprocity partner" list — engineering has none, so any site showing one is inventing it. When the stakes are a sealed submittal or a job start date, verify with the board and NCEES.

Building your NCEES Record: what it costs and what slows it down

NCEES charges nothing to build a Record and no annual renewal fee; you pay only when you send it, $175 for the first comity transmittal and $100 for each one after. NCEES puts the average time to complete a Record at two to three weeks, but that average hides where the delays come from. The application has five sections (education, work experience, license-history questions, exam and license verification, and references), and every one must show complete before NCEES will transmit anything. Transcripts must come straight from each school to NCEES, including any college where you took a single course, and NCEES needs two to three business days to post them after they arrive. Exam and license verifications are entered by state boards, and NCEES does not control how fast a board responds. You need five references signed within the past 12 months: at least three U.S.-licensed engineers and two people who can speak to your character and are not related to you. Any gap of more than six months not covered by school or work gets flagged and must be explained. Start the work-experience entries first, because each one is reviewed by NCEES and then sent to your supervisor for sign-off. Completed verifications do not expire, so the second time you use the Record is much faster than the first.

Experience verification: the step boards are strictest about

Your degree and exam results are easy for a board to confirm. Your experience is not, which is why boards put their tightest rules here. Washington accepts an experience verifier who is licensed in the jurisdiction where the work was done, not necessarily in Washington, but a self-employed engineer cannot verify their own experience. Mississippi splits comity applicants by career length: if you have been licensed and practicing for less than ten years, PE supervisors who had review and approval authority over your work must verify at least four years of experience; with ten years or more, you should still ask former supervisors and, where that is impossible, explain why in writing so the board can consider forms from other PEs who know your work. Mississippi also wants at least one reference dated within the last 12 months from a licensee who knows your recent work, and it rejects any paper form that was not sealed in an envelope and signed across the flap by the verifier. The practical lesson: contact former supervisors before you need them, while they are still easy to reach, and get their sign-off into your NCEES Record so it can be reused.

State law exams and other add-ons

Comity never repeats the FE or PE, but about a fifth of boards ask for a short test of their own law. Of the 51 boards in our dataset, 11 list a state law, rules or ethics exam or questionnaire that a comity applicant must complete. Most are open-book and none is hard, but each one is a separate step that has to be finished before the license issues. Washington is a good example of how they fit in: even when you send an NCEES Record, the board still wants its own online application plus a completed Washington Engineer Law Review, and it will not accept a copy of your old license as proof of your exams; that verification must come through NCEES. Alaska adds two requirements for every engineer, comity applicants included: a Board-approved arctic engineering course and a jurisprudence questionnaire covering the state's licensing statutes and regulations. Alaska lets you file before finishing the arctic course so the rest of the review can start. Read the destination's instructions for these extras before you file, because an application that is otherwise complete can sit idle waiting for a questionnaire you did not know about.

Board calendars set the real timeline

Many engineering boards approve comity applications only at scheduled meetings, so the date your file is complete matters more than the date you mail it. Alaska's board meets four times a year, usually in February, May, August and November; your application, fee and every supporting document must reach the Juneau office 30 days before a meeting, and the board notifies you within three weeks after it. Miss that cutoff by a day and you wait for the next quarter. Mississippi's review committee usually meets at the end of each month and issues licenses then. Massachusetts reviews comity files at its monthly board meeting in the order received; a decision usually takes two to three months, and the board's administrator advises allowing up to six. Oregon quotes two to four months depending on when the application arrives relative to its meeting schedule, and Washington says comity files can take up to eight weeks. Work backward from the meeting date: finish the NCEES Record (two to three weeks on average), clear any state law exam, and have the board holding a complete file before its cutoff.

Working before the new license issues

The rule to plan around is simple: until the destination board issues your license, you may not offer or perform engineering there. Mississippi states it plainly. It has no temporary permits, allows no one-project or short-term unlicensed practice, and does not let an applicant offer services, start a project, or use an out-of-state seal with a note that the Mississippi application is in process. The license is dated the day the board approves it. A few states do offer a bridge. Massachusetts issues a temporary permit to an engineer licensed elsewhere: on its own it lasts 30 days, but filed with or after a comity application it can run while the board reviews the file, up to 12 months. It is not available to Massachusetts residents or to applicants with a Massachusetts business address. Texas frames the same principle through its practice act, which requires engineering work in Texas to be performed by, or directly supervised by, a Texas-licensed engineer. If a project in a new state has a start date, file comity early enough that the license is in hand before the work begins.

Your firm may need its own registration

An individual PE license lets you practice; in many states it does not let your company offer engineering to the public. Texas requires any firm offering engineering services in Texas to register with the board, including firms based in other states and sole practitioners. A firm can register only if at least one of its engineers holds a Texas license, and the registration lasts one year, so it has to be renewed annually. Illinois goes further: every firm offering professional engineering, structural engineering, architecture or land surveying there must be licensed as a Professional Design Firm, must also be authorized by the Illinois Secretary of State to do business, and needs an Illinois licensee designated as managing agent for each profession it offers. If one of those professions lapses, the whole firm license goes inoperable. When you are the engineer a firm plans to name for a new state, your comity license is only the first step, and the firm filing follows it.

Structural engineers: a second license in some states

A PE license does not always cover structural work. Illinois licenses Structural Engineers and Professional Engineers separately, and an Illinois PE cannot perform or offer structural services. Illinois grants the SE license by endorsement, but it does not accept the 8-hour PE Civil: Structural exam, the 16-hour Western States exam, or a state-written Structural III exam as meeting its exam requirement. Washington requires you to hold a Washington PE license before you can apply for its structural license, plus two years of structural experience on top of the eight years its PE registration requires. An engineer whose only exam is the 16-hour NCEES structural exam must also have passed the 8-hour NCEES PE exam. If structural work is your specialty, consider the NCEES Model Law Structural Engineer designation, which signals to boards that your Record meets a national structural standard: it requires an EAC/ABET-accredited engineering degree with at least 18 semester hours of structural analysis and design (at least 9 of them in design), the FE and a qualifying structural exam, four years of structural experience, and a clean disciplinary record. The review costs $50.

If your degree is from outside the U.S.

Comity assumes an EAC/ABET-accredited degree. If yours is not, usually because you studied outside the United States, boards rely on an NCEES Credentials Evaluation to decide whether your education meets the NCEES Engineering Education Standard. It costs $400, a re-evaluation costs $100, and sending it to additional boards is free. NCEES typically completes one within 15 business days of purchase, but you cannot buy it until your documents arrive and are verified: an official transcript mailed by the school, the diploma or graduation certificate, and official course descriptions for every university you attended, with certified literal English translations of anything not in English. The finished evaluation becomes part of your NCEES Record. Some boards make it mandatory. Mississippi accepts no other evaluation service, allows no waiver, and tells applicants without one in their Record not to apply until the result is back; if the evaluation finds gaps, the board may let you cure them with coursework. Mississippi does treat a degree accredited by the Canadian Engineering Accreditation Board as equivalent to EAC/ABET.

Key terms in the glossary: licensure by endorsement, interstate compact, primary state of residence, reciprocity.

Frequently asked questions

Do I have to retake the PE exam to get licensed in another state?

No. The FE and PE are national NCEES exams; your passing results move with you inside your NCEES Record and are not re-administered. A few states add a separate state-specific exam — such as California's or Oregon's seismic and surveying exams — but the FE and PE themselves are never repeated.

Is licensure by comity the same as reciprocity or endorsement?

In engineering, yes — the three words name the same process: a state issuing you a new PE license based on the one you already hold, after confirming your credentials meet its practice act. Comity is the term most state boards and NCEES use for it.

How much does moving an NCEES Record between boards cost?

NCEES charges $175 to transmit your Record to the first board and $100 for each additional board (as of mid-2026; confirm current fees at ncees.org). The destination board's own comity application fee is separate and set by the state.

Can one NCEES Record cover licensure in several states?

Yes, and that is its purpose: you maintain a single Record and transmit it to every board you apply to, paying the reduced per-board fee after the first. Engineers licensed in several states renew each license separately but source them all from one Record.

Do I have to keep paying NCEES to keep my Record active?

No. NCEES charges nothing to set up a Record and has no annual renewal fee. You pay only when you send it to a board: $175 for the first comity transmittal and $100 for each one after that. You do need to review and update the Record each time you transmit it.

Which states require an NCEES Record for comity?

NCEES lists six: Georgia, Kentucky, Massachusetts, Puerto Rico, Rhode Island and Wyoming. Every U.S. licensing board accepts the Record, but in these jurisdictions it is mandatory rather than optional.

Can I start a project in the new state while my comity application is pending?

Generally no. Mississippi, for example, issues no temporary permits and does not let applicants offer services, begin a project, or seal work with an out-of-state seal while an application is in process. Massachusetts is an exception: it offers a temporary permit of 30 days, which can run up to 12 months while a comity application is under review, though not to Massachusetts residents.

How much continuing education will I need once I hold licenses in several states?

Each state sets its own requirement, and NCEES expects you to meet the requirement of every jurisdiction that licensed you by comity. The NCEES Continuing Professional Competency Standard, which boards are encouraged to accept, is 15 professional development hours per calendar year with no carryover, at least one of them in ethics.

Sources

Primary sources only — official boards and compact commissions. Data last verified 2026-10-29.

Reviewed by the License Reciprocity Editorial Team · verified against primary sources 2026-10-29

How we verify · All sources · Corrections log · spot an error? hello@licensereciprocity.com