Skip to content
LicenseReciprocity

Engineering License from Texas to Georgia: Does It Transfer? (2026)

Generated from a source-cited dataset with AI-assisted research; facts checked against official sources · How these pages are made

Does Georgia accept a Texas PE license?

A PE license transfers from Texas to Georgia by endorsement — there is no automatic reciprocity, but you do not start over. Apply to the Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board), verify your Texas license, and meet Georgia's endorsement requirements. FE and PE exam results transfer through your NCEES Record and are not retaken; Georgia has no separate state jurisprudence or law exam for comity.

Verify this exact pair in the checker

Same data, interactive — with share link and board links.

Run the Reciprocity Checker →

Verdict

Licensure by endorsement

Georgia grants PE licensure by comity, so a Professional Engineer licensed in Texas does not start over — but does file a full Georgia application. Your Texas license, ABET degree, qualifying experience, and FE and PE results reach the Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board) through your NCEES Record; the board's task is to confirm they meet Georgia's practice act, not to re-test you. Two things govern your timeline: keeping your Texas license active and unencumbered while the Georgia application is pending, and clearing any Georgia-specific exam or statutes review before the license issues.

What's different between Texas and Georgia

Computed from both states' verified data rows, in both directions, and from the route every other origin gets into Georgia. Exam notes are our summary of each board's published rules, with sources below.

Route, each way

Texas to Georgia (this page): Licensure by endorsement.

Georgia to Texas (the reverse move): Licensure by endorsement.

The route is the same in both directions.

Does coming from Texas matter?

Coming from Texas does not change the answer: every origin (the other 49 states and DC) gets the same result for a move into Georgia.

Application fee

Georgia lists $100 for an out-of-state applicant and Texas lists $75 for the reverse move; neither may be the full cost.

Processing time

Georgia lists up to 4 weeks; Texas lists about 8 weeks for the reverse move.

Georgia's longest listed wait is 4 weeks shorter than Texas's.

Exam rules on record

Georgia and Texas carry different exam notes (our summaries, below); any state law or jurisprudence exam is listed with each state's requirements.

  • Georgia (this move): FE and PE exam results transfer through your NCEES Record and are not retaken; Georgia has no separate state jurisprudence or law exam for comity
  • Texas (the reverse move): FE and PE exam results transfer through your NCEES Council Record and are not retaken; applicants already licensed as a PE in another U.S. state qualify for a waiver of the PE examination, but EVERY applicant must additionally pass the open-book Texas Ethics of Engineering examination (state-specific)

What changes, Texas → Georgia

Side-by-side: Texas vs Georgia (Engineering (PE)), verified 2026-07-21
Texas (current)Georgia (destination)
Application fee$75 (TBPELS PE license application fee (covers the Texas Ethics of Engineering exam); a fingerprint-based criminal-history check is also required (fee paid to the state's fingerprint vendor). Transmitting an NCEES Record costs $175 first board / $100 each additional, paid separately to NCEES. Renewal is $100 for two years.)$100 ($100 Professional or Structural Engineer Application by Comity fee (non-refundable) per the board's official fee schedule, plus a $5 processing fee for each online submission; transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES)
Processing time~8 weeks (TBPELS states an average application processing time of about two months (eight weeks) on its PE Application Process page, depending on the adequacy of the submittal; the ethics exam, NCEES Record, and fingerprint TX DPS/FBI criminal-history check must all clear before licensure (outgoing verification requests can separately take up to 30 business days).)up to 4 weeks (The Georgia SOS How-To Guide states comity applications are generally processed within about 20 business days (~4 weeks) of a complete application, evaluated in order received; a deficiency notice restarts the 20-day count)
Licensing authorityTexas Board of Professional Engineers and Land Surveyors (TBPELS)Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board)

The destination column is what you must satisfy — Georgia sets the rules for this move.

Step by step

  1. Confirm Georgia's current requirements on the Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board) website (linked below) — rules change.
  2. Submit the endorsement application to the Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board) (application linked below).
  3. Arrange license verification from your current state via the verification system.
  4. Hold an active PE license in good standing in another U.S. jurisdiction based on comparable qualifications (NCEES Model Law Engineer status expedites review).
  5. Have NCEES transmit a completed NCEES Record to the Georgia PELS Board (Georgia requires the NCEES Record for comity licensure).
  6. Provide a secure and verifiable document establishing lawful presence (Georgia SAVE requirement).
  7. Show no record of disciplinary action against any license held.
  8. Pay the fees listed above, and allow for the processing time shown there.

Official links

Related guides

Frequently asked questions

Can I keep my Texas PE license after I'm licensed in Georgia?

Yes — PE licenses stack. Keep the Texas license active (its renewal and continuing-education/PDH clock run separately) and you hold both. Engineers working near state lines or nationally routinely carry several PE licenses at once, all sourced from a single NCEES Record.

Sources

Primary sources only — official boards and compact commissions. Data last verified 2026-07-21.

Reviewed by the License Reciprocity Editorial Team · verified against primary sources 2026-07-21

How we verify · All sources · Corrections log · spot an error? hello@licensereciprocity.com