Skip to content
LicenseReciprocity

Engineering License from Texas to Michigan: Does It Transfer? (2026)

Generated from a source-cited dataset with AI-assisted research; facts checked against official sources · How these pages are made

Does Michigan accept a Texas PE license?

A PE license transfers from Texas to Michigan by endorsement — there is no automatic reciprocity, but you do not start over. Apply to the Michigan Board of Professional Engineers (Department of Licensing and Regulatory Affairs, Bureau of Professional Licensing), verify your Texas license, and meet Michigan's endorsement requirements. FE and PE exam results transfer through your NCEES Record and are not retaken; Michigan also accepts NCEES certification. Michigan has no separate state jurisprudence or law exam for engineers.

Verify this exact pair in the checker

Same data, interactive — with share link and board links.

Run the Reciprocity Checker →

Verdict

Licensure by endorsement

Michigan grants PE licensure by comity, so a Professional Engineer licensed in Texas does not start over — but does file a full Michigan application. Your Texas license, ABET degree, qualifying experience, and FE and PE results reach the Michigan Board of Professional Engineers (Department of Licensing and Regulatory Affairs, Bureau of Professional Licensing) through your NCEES Record; the board's task is to confirm they meet Michigan's practice act, not to re-test you. Two things govern your timeline: keeping your Texas license active and unencumbered while the Michigan application is pending, and clearing any Michigan-specific exam or statutes review before the license issues.

What's different between Texas and Michigan

Computed from both states' verified data rows, in both directions, and from the route every other origin gets into Michigan. Exam notes are our summary of each board's published rules, with sources below.

Route, each way

Texas to Michigan (this page): Licensure by endorsement.

Michigan to Texas (the reverse move): Licensure by endorsement.

The route is the same in both directions.

Does coming from Texas matter?

Coming from Texas does not change the answer: every origin (the other 49 states and DC) gets the same result for a move into Michigan.

Application fee

Michigan lists $75–$115 for an out-of-state applicant and Texas lists $75 for the reverse move; neither may be the full cost.

Processing time

Texas lists about 8 weeks for the reverse move; Michigan has no verified processing-time figure on file, so the two cannot be compared here.

Exam rules on record

Michigan and Texas carry different exam notes (our summaries, below); any state law or jurisprudence exam is listed with each state's requirements.

  • Michigan (this move): FE and PE exam results transfer through your NCEES Record and are not retaken; Michigan also accepts NCEES certification. Michigan has no separate state jurisprudence or law exam for engineers
  • Texas (the reverse move): FE and PE exam results transfer through your NCEES Council Record and are not retaken; applicants already licensed as a PE in another U.S. state qualify for a waiver of the PE examination, but EVERY applicant must additionally pass the open-book Texas Ethics of Engineering examination (state-specific)

What changes, Texas → Michigan

Side-by-side: Texas vs Michigan (Engineering (PE)), verified 2026-07-21
Texas (current)Michigan (destination)
Application fee$75 (TBPELS PE license application fee (covers the Texas Ethics of Engineering exam); a fingerprint-based criminal-history check is also required (fee paid to the state's fingerprint vendor). Transmitting an NCEES Record costs $175 first board / $100 each additional, paid separately to NCEES. Renewal is $100 for two years.)$75–$115 (Per the Michigan State License Fee Act (MCL 338.2213): a $35 application processing fee plus a license fee of $40 per year, prorated for the time remaining in the biennial cycle (up to $80), so the amount due at initial licensure by endorsement runs roughly $75-$115. Biennial renewal is $80. (Statute lowers these to a $30 application processing fee and $20/year license fee after Sept 30, 2027.) Transmitting an NCEES Record costs $175 first board / $100 each additional, paid separately to NCEES)
Processing time~8 weeks (TBPELS states an average application processing time of about two months (eight weeks) on its PE Application Process page, depending on the adequacy of the submittal; the ethics exam, NCEES Record, and fingerprint TX DPS/FBI criminal-history check must all clear before licensure (outgoing verification requests can separately take up to 30 business days).)LARA/Board publishes no comity turnaround; out-of-state (endorsement) applications are reviewed by the Board of Professional Engineers. NCEES Record completion itself averages 2-3 weeks
Licensing authorityTexas Board of Professional Engineers and Land Surveyors (TBPELS)Michigan Board of Professional Engineers (Department of Licensing and Regulatory Affairs, Bureau of Professional Licensing)

The destination column is what you must satisfy — Michigan sets the rules for this move.

Step by step

  1. Confirm Michigan's current requirements on the Michigan Board of Professional Engineers (Department of Licensing and Regulatory Affairs, Bureau of Professional Licensing) website (linked below) — rules change.
  2. Submit the endorsement application to the Michigan Board of Professional Engineers (Department of Licensing and Regulatory Affairs, Bureau of Professional Licensing) (application linked below).
  3. Arrange license verification from your current state via the verification system.
  4. Hold a PE license in another state with qualifications equivalent to Michigan's licensure requirements.
  5. Submit an NCEES Record (or NCEES certification) transmitted to LARA.
  6. Meet the underlying standard: an ABET-accredited engineering degree, the FE and PE exams, and 4 years of qualifying experience.
  7. Pay the fees listed above, and allow for the processing time shown there.

Official links

Related guides

Frequently asked questions

Can I keep my Texas PE license after I'm licensed in Michigan?

Yes — PE licenses stack. Keep the Texas license active (its renewal and continuing-education/PDH clock run separately) and you hold both. Engineers working near state lines or nationally routinely carry several PE licenses at once, all sourced from a single NCEES Record.

Sources

Primary sources only — official boards and compact commissions. Data last verified 2026-07-21.

Reviewed by the License Reciprocity Editorial Team · verified against primary sources 2026-07-21

How we verify · All sources · Corrections log · spot an error? hello@licensereciprocity.com